Core Trades is the largest section of the CSLB General Building (B) exam, about 30%. CSLB's B study guide splits it into seven subtopics: plumbing; electrical; HVAC; concrete; earthwork and surveying; insulation, acoustical and weatherproofing; and roofing. A B contractor coordinates these trades, so the questions ask what the code requires of each one rather than how to do the specialty work.
The rules come from several 2025 California codes: the Plumbing Code (CPC), the Mechanical Code (CMC), the Electrical Code (the 2023 NEC as adopted by the 2025 California Electrical Code, cited here as CEC), the Residential Code (CRC), the Building Code (CBC), the Energy Code and CALGreen. Title 8 adds trench and electrical safety rules, and the Government Code sets the 811 rules. This note gives the most-tested number in each area and where it comes from.
Plumbing
- Drain slope. Horizontal drainage piping slopes at least 1/4 inch per foot (2%). A building drain 4 inches or larger may slope 1/8 inch per foot, only with the authority's approval first. A 3-inch drain 60 feet long needs 15 inches of fall. (2025 CPC §708.1)
- Cleanouts. One at the upper end of each horizontal drain, one for each 100 feet of developed length, and one for each total change of direction over 135 degrees (2025 CPC §707.4). Building sewer cleanouts are no more than 100 feet apart; approved manholes may be up to 300 feet apart (2025 CPC §719).
- Traps and vents. A trap seal is 2 to 4 inches (2025 CPC §1005.1). A vent ends at least 6 inches above the roof and 1 foot from a vertical surface (2025 CPC §906.1), and at least 10 feet from, or 3 feet above, an opening (2025 CPC §906.2).
- Pressure. A regulator is required when static pressure is over 80 psi. (2025 CPC §608.2)
- Nail plates. A pipe within 1 inch of the framing edge gets a No. 18 gauge steel plate extending 1 1/2 inches past it. (2025 CPC §312.9)
- Water heaters. Straps in the upper and lower third, the lower one at least 4 inches above the controls (2025 CPC §507.2). A pan is at least 1 1/2 inches deep with a 3/4-inch drain (2025 CPC §507.5). In a garage, the ignition source is at least 18 inches above the floor unless the heater is flammable-vapor-ignition-resistant (2025 CPC §507.13). The relief valve never drains into the pan.
- Gas pipe is buried at least 12 inches, 18 inches where damage is likely. (2025 CPC §1210.1.1)
- Fixture spacing. A water closet is at least 15 inches from its center to a side wall, 30 inches center to center, with 24 inches clear in front. (2025 CPC §402.5)
- Showers. At least 1,024 square inches of floor, holding a 30-inch circle (2025 CPC §408.7); curb 1 inch lower than the sides, floor sloped 1/8 to 1/2 inch per foot, and a 22-inch door (2025 CPC §408.6).
- Water use. Water closets 1.28 gallons per flush; showerheads 1.8 gpm at 80 psi; kitchen faucets 1.8 gpm at 60 psi. (2025 CALGreen §4.303.1)
Tests. DWV: a 10-foot head of water for 15 minutes, or 5 psi of air. Water supply: working pressure, or 50 psi of air, never air on plastic except PEX, PP or PE-RT where allowed. Gas: 10 psi for 15 minutes. (2025 CPC §712.2, §609.4, §1213.3)
Electrical
Circuits and protection in homes
- Required circuits. Two or more 20-amp small-appliance circuits for the kitchen and dining areas, at least one 20-amp laundry circuit, a 120-volt, 20-amp bathroom circuit and a 120-volt, 20-amp garage circuit. (2025 CEC §210.11(C))
- Wire and breaker. 14 AWG copper is limited to 15 amps, 12 AWG to 20 amps and 10 AWG to 30 amps. A 20-amp breaker on 14 AWG is never allowed on an ordinary branch circuit. (2025 CEC §240.4(D))
- GFCI. Dwelling receptacles from 125 to 250 volts in bathrooms, kitchens, garages, outdoors, basements, crawl spaces, laundry areas and within 6 feet of a sink or tub need GFCI protection, so a 120/240-volt dryer receptacle in the laundry needs it too. (2025 CEC §210.8(A))
- AFCI. 120-volt, 15- and 20-amp circuits feeding kitchens, bedrooms, living areas, closets, hallways and laundry areas need AFCI protection. Bathrooms and garages are not on that list. (2025 CEC §210.12)
Receptacles
| Location | Rule | Source |
|---|---|---|
| Room walls | No point on the floor line more than 6 feet from a receptacle | 2025 CEC §210.52(A) |
| Kitchen counter | Counters 12 inches or wider; no point more than 24 inches from a receptacle | 2025 CEC §210.52(C) |
| Bathroom | Within 3 feet of each sink | 2025 CEC §210.52(D) |
| Outdoors, one-family | Front and back, no more than 6 1/2 feet above grade | 2025 CEC §210.52(E) |
| Garage | At least one per vehicle bay | 2025 CEC §210.52(G) |
| Near a tub or shower | None within 3 feet, up to 8 feet above the rim | 2025 CEC §406.9(C) |
| HVAC equipment | Service receptacle within 25 feet | 2025 CEC §210.63 |
A receptacle more than 5 1/2 feet above the floor does not count as a required one. (2025 CEC §210.52)
Wiring methods
- Holes in studs. A hole edge less than 1 1/4 inches from the stud face needs a 1/16-inch steel plate. (2025 CEC §300.4(A))
- NM cable is secured every 4 1/2 feet and within 12 inches of each box. (2025 CEC §334.30)
- Box fill. Each 14 AWG conductor counts 2.00 cubic inches and each 12 AWG 2.25; a device counts as 2 conductors. (2025 CEC §314.16(B))
- Burial depth. Direct-burial cable 24 inches, rigid metal conduit 6 inches, nonmetallic raceway 18 inches, a 120-volt, 20-amp GFCI residential circuit 12 inches. (2025 CEC Table 300.5(A))
- Ground rod. At least 8 feet long; a single rod needs a second electrode unless it tests at 25 ohms or less, and a second rod goes at least 6 feet away. (2025 CEC §250.53)
- Working space in front of a house panel is 3 feet deep and 30 inches wide, or the width of the panel if that is wider. (2025 CEC §110.26(A))
On the job site, Cal/OSHA requires GFCI protection or an assured grounding program on 120-volt, 15- and 20-amp temporary receptacles (8 CCR §2405.4), and keeps equipment at least 10 feet from overhead lines of 600 to 50,000 volts for booms and stored materials (8 CCR §2946). Smoke alarm rules for homes are in the Planning and Estimating note.
HVAC
- Sizing. One ton of cooling is 12,000 Btu per hour (trade practice). Loads use ACCA Manual J, ducts Manual D and equipment Manual S. (2025 CALGreen §4.507.2)
- Attic appliances. Access at least 22 by 30 inches, a passageway at least 24 inches wide, no more than 20 feet long (50 feet where it is 6 feet or higher), a 30-by-30-inch working platform, and a light and receptacle near the appliance. (2025 CMC §304.4)
- Garages. No duct opening into the garage; ducts through the garage wall or ceiling are No. 26 gage steel. (2025 CRC §R302.5.2)
- Combustion air. Indoor air allows 50 cubic feet per 1,000 Btu/h of input. Two outdoor openings each give 1 square inch per 4,000 Btu/h with direct or vertical ducts, or per 2,000 Btu/h with horizontal ducts. (2025 CMC §701)
- Condensate pipe slopes at least 1/8 inch per foot. (2025 CMC §310.1)
- Ducts. At least R-6.0 insulation (2025 Energy Code §150.0(m)1); leakage no more than 5% of air handler airflow, tested (2025 Energy Code §150.0(m)11).
- Exhaust. A bathroom fan gives 50 cfm on demand or 20 cfm continuous (2025 Energy Code §150.0(o)), with humidity control adjustable from 50% or less up to 80% (2025 CALGreen §4.506.1). In a bathroom with a tub or shower, a window does not replace the fan.
- Dryer duct. 4 inches, rigid metal, no more than 14 feet with two 90-degree elbows, minus 2 feet for each extra elbow; it ends at least 3 feet from openings. (2025 CMC §504.4.2)
Concrete
- Strength. Foundation concrete is at least 2,500 psi at 28 days; exposed walls, porches and garage slabs need 3,000 or 3,500 psi depending on weathering. (2025 CRC §R402.2)
- Footings. At least 12 inches wide and 6 inches thick, and at least 12 inches below undisturbed ground. The bottom may slope no more than 1 in 10. (2025 CRC §R403.1)
- Rebar cover. 3 inches cast against earth; 1 1/2 inches for No. 5 and smaller in forms exposed to weather; 3/4 inch where not exposed. Rebar size numbers are eighths of an inch, so No. 5 is 5/8 inch. (2025 CRC §R403.1.3.5.3)
- Above grade. The foundation extends at least 6 inches above finished grade. (2025 CRC §R404.1.6)
- Slabs. At least 3 1/2 inches thick (2025 CRC §R506.1), on a 4-inch base (2025 CRC §R506.3.2), over a 6-mil vapor retarder with 6-inch laps (2025 CRC §R506.3.3). CALGreen adds a capillary break of 4 inches of 1/2-inch or larger clean aggregate (2025 CALGreen §4.505.2.1).
- Masonry mortar joints are 3/8 inch, and grout is placed within 1 1/2 hours of adding water. (2025 CRC §R606.3)
- Job safety. Rebar ends up to 6 feet high get impalement covers (8 CCR §1712). The silica PEL is 50 micrograms per cubic meter and the action level 25 (8 CCR §1532.3).
Estimating. A footing 144 feet long, 18 inches wide and 12 inches deep holds 144 × 1.5 × 1 = 216 cubic feet ÷ 27 = 8 cubic yards. At 4 inches thick, one cubic yard covers 81 square feet of slab.
Earthwork and surveying
Grading and soil
- Drainage. Grade falls at least 6 inches in the first 10 feet from a house; paved surfaces within 10 feet slope 2% away (2025 CRC §R401.3). The CBC states it as 5% for 10 feet (2025 CBC §1804.4).
- Slopes. Permanent cut and fill slopes are no steeper than 1 vertical to 2 horizontal; a steeper cut slope needs a soil investigation report the building official accepts (2025 CBC §3304.1.1). Fill is compacted to 90% of maximum density in lifts of no more than 12 inches (2025 CBC §J107.5).
- Footing setbacks. From the toe of a slope above, H/2 but no more than 15 feet; from a slope below, H/3 but no more than 40 feet. (2025 CBC §1808.7)
- Presumptive bearing. Clay and silt 1,500 psf, sand 2,000, sandy gravel 3,000. (2025 CBC §1806.2)
- Expansive soil has a plasticity index of 15 or more, among other tests. (2025 CRC §R403.1.8.1)
811 and trenches
- 811. Call at least 2 working days, and no more than 14 calendar days, before digging (Gov. Code §4216.2). The tolerance zone is 24 inches on each side of the marking; inside it, find the line with hand tools before using power equipment (Gov. Code §4216.4).
- Permit. A Cal/OSHA permit is needed for an excavation 5 feet or deeper that a person must enter. (8 CCR §341)
- Cave-in protection is required at 5 feet, and shallower if a competent person sees signs of a possible cave-in (8 CCR §1541.1). Maximum slopes under 20 feet deep: Type A 3/4 to 1, Type B 1 to 1, Type C 1 1/2 to 1 (8 CCR §1541.1, App. B).
- Access and spoil. A trench 4 feet or deeper has a way out within 25 feet of travel; spoil stays at least 2 feet from the edge. (8 CCR §1541)
Surveying math
These are common building practice. Height of instrument = benchmark + backsight; an elevation = HI − foresight. With a benchmark of 250.00 feet and a backsight of 5.42, HI is 255.42; a foresight of 3.18 puts the form top at 252.24 feet. A drop of 3 feet in 120 feet is a 2.5% grade. A 24-by-32-foot layout is square when both diagonals are 40 feet.
Insulation, acoustical, and weatherproofing
- Insulation minimums, new homes. Ceilings R-22 (U-0.043); 2x4 walls R-15 (U-0.095); 2x6 walls U-0.069; raised floors R-19. (2025 Energy Code §150.0)
- Clearance. Combustible insulation stays 3 inches from recessed lights, fan motors and other heat sources unless listed for less. (2025 CRC §R302.14)
- Vapor retarders. Class I is 0.1 perm or less, Class II over 0.1 to 1.0, Class III over 1.0 to 10. (2025 CRC §R702.7)
- Attic vents 1/150 of the area; crawl space vents 1 square foot per 150 square feet. (2025 CRC §R806.2; 2025 CRC §R408.2)
- Water-resistive barrier laps 2 inches horizontally and 6 inches at vertical joints (2025 CRC §R703.2); veneer weepholes are no more than 33 inches apart (2025 CRC §R703.8.6).
- Foundations. Dampproofing runs from grade down to the top of the footing, or to 6 inches below the top of a basement floor if that is higher; a foundation drain sits on 2 inches of gravel and is covered by 6 inches. (2025 CRC §R406.1, §R405.1)
- Sound between units. Walls and floors reach STC 50 (lab) or NNIC 45 (field); floors also need IIC 50. (2025 CBC §1206)
Roofing
| Covering | Minimum slope | Source |
|---|---|---|
| Asphalt shingles | 2:12 (double underlayment from 2:12 to 4:12) | 2025 CRC §R905.2.2 |
| Clay and concrete tile | 2 1/2:12 | 2025 CRC §R905.3.2 |
| Wood shingles, shakes, metal shingles | 3:12 | 2025 CRC §R905.4, §R905.7, §R905.8 |
| Slate | 4:12 | 2025 CRC §R905.6 |
| Built-up, modified bitumen, single-ply | 1/4:12 | 2025 CRC §R905.9 to §R905.13 |
- Shingle fasteners. At least 4 nails per strip shingle, 12 gage, with a 3/8-inch head, reaching 3/4 inch into the sheathing. (2025 CRC §R905.2.5, §R905.2.6)
- Drip edge laps 2 inches at joints and extends 1/4 inch below the sheathing. At the eave the underlayment goes over the drip edge; at the rake the drip edge goes over the underlayment. (2025 CRC §R905.2.8.5)
- Flashing metal is at least 0.019 inch (No. 26 galvanized). A chimney or penetration more than 30 inches wide needs a cricket. (2025 CRC §R903.2)
- Chimney height. At least 2 feet above anything within 10 feet, and at least 3 feet above the point where it passes through the roof. (2025 CRC §R1003.9)
- Reroofing. A new covering may not go over 2 or more existing layers, or over slate or tile. (2025 CRC §R908.4) Outside fire hazard severity zones and wildland-urban interface areas, replacing more than 50% of a roof within any one-year period brings the whole roof to at least Class C (2025 CRC §R902.1.2).
- Fall protection. Residential-type roofing up to 7:12 needs it at 6 feet or more, and at any height above 7:12 (8 CCR §1731); non-residential roofing above 20 feet (8 CCR §1730).
Estimating. A 1,800-square-foot roof plus 10% waste is 19.8 squares; at 3 bundles a square, buy 60 bundles.
Traps to watch for
- Three air tests. DWV 5 psi, water supply 50 psi, gas 10 psi.
- The wire limits the breaker. 14 AWG copper never goes on a 20-amp breaker; 20-amp kitchen, laundry, bathroom and garage circuits need 12 AWG.
- GFCI is not AFCI. Bathrooms and garages are on the GFCI list but not the AFCI list.
- Trench depths. A way out at 4 feet, a Cal/OSHA permit and cave-in protection at 5 feet.
- Slope caps. H/2 up to 15 feet at the toe; H/3 up to 40 feet at the top.
- Old numbers. Roofing fall protection for houses is 6 feet since July 1, 2025; older books show other heights.
For answered practice questions on this section, start with plumbing, electrical, HVAC, concrete, earthwork and surveying, insulation and weatherproofing and roofing. For more depth, read the guides on GFCI, AFCI and outlet rules, concrete footings and rebar, trench and excavation safety and roof underlayment and flashing. Trench and power-line safety also appear in the Safety notes.