Safety: Cal/OSHA, Traffic Control and Environmental Rules for the B Exam

Section 5 of 5, about 15% of the B examUpdated

CSLB's subtopics: Personnel safety, Transportation and traffic control, Environmental safety.

Safety is about 15% of the CSLB General Building (B) exam. CSLB's B study guide splits it into three subtopics: personnel safety, transportation and traffic control, and environmental safety. Most of the rules come from Cal/OSHA's safety orders in Title 8 of the California Code of Regulations, which CSLB lists as a reference. Traffic control adds the California MUTCD and the Vehicle Code, and environmental safety adds the State Water Board's stormwater permit, CALGreen and the federal lead renovation rule. This note covers the numbers and duties that questions in this section are built on, with the section each one comes from.

Section numbers below are Title 8 sections unless another code is named. Title 8 is a public text, so you can read every section free on the Department of Industrial Relations site.

Personnel safety

Safety programs, meetings and reports

  • Written programs. Every construction employer must have an effective Injury and Illness Prevention Program (IIPP) and a written Code of Safe Practices that fits its own work. The Code is posted in a conspicuous place at each job site office, or given to each supervisor, who keeps it readily available. (8 CCR §1509)
  • Toolbox (tailgate) meetings. Supervisors hold toolbox or tailgate safety meetings, or an equivalent, with their crews at least every 10 working days. (8 CCR §1509)
  • New workers. When a worker is first hired, the employer gives instruction on the hazards and safety precautions of the work and directs the worker to read the Code of Safe Practices. (8 CCR §1510)
  • Site survey. Before employees are on a site, the employer surveys site conditions to find the predictable hazards and the safeguards they need. (8 CCR §1511)
  • Serious injury report. A work-related death or serious injury or illness is reported to Cal/OSHA immediately, which means as soon as practically possible and no longer than 8 hours after the employer knows, or with diligent inquiry would have known, of it. With exigent circumstances the limit is 24 hours. Inpatient hospitalization for more than observation or testing counts as serious. (8 CCR §342)

First aid, water, toilets and washing

  • First aid. Each employer on a project provides at least one first-aid kit in a weatherproof container. Drugs, antiseptics and eye irrigation solutions may be kept in it only with written approval from an employer-authorized licensed physician. The phone numbers of a physician, hospitals, ambulance and fire services are posted near the job phone. A building of 5 or more floors, or 48 feet or more, above or below ground needs a two-way voice emergency communication system and a basket litter. (8 CCR §1512)
  • Drinking water. A shared container closes tightly and has a faucet or drinking fountain; no dipping. (8 CCR §1524)
  • Toilets. At least one separate toilet facility for each 20 employees or fraction of 20, of each sex. With fewer than 5 employees, one single-user toilet designated for all-gender use is enough. (8 CCR §1526)
  • Washing stations. At least one for each 20 employees or fraction of 20. (8 CCR §1527)

The "or fraction" wording means you round up for each group. A crew of 30 men and 8 women needs 2 toilets for the men (30 ÷ 20 = 1.5) and 1 for the women (8 ÷ 20 = 0.4), so 3 toilet facilities. A site with 45 employees needs 3 washing stations (45 ÷ 20 = 2.25).

Housekeeping and fire extinguishers

  • Solvent-soaked rags and other flammable or hazardous waste go in covered containers kept separate from normal debris. Material may not be thrown from a building to where employees may be unless the drop area is fenced or barricaded and signs are posted. (8 CCR §1513)
  • Provide a fire extinguisher rated at least 2A for each 3,000 square feet of floor area or fraction of it, with no more than 75 feet of travel to one. A single-family dwelling needs one 2A extinguisher at the job site during working hours. An extinguisher rated at least 10B must be within 50 feet of a place where more than 5 gallons of flammable or combustible liquid are in use. (8 CCR §1922)

A 10,000-square-foot floor needs 4 extinguishers: 10,000 ÷ 3,000 = 3.33, and the fraction needs one more.

Fall protection: which height applies

The height that triggers fall protection depends on the kind of work. This is the most tested table in the section.

Work Fall protection required Source
General construction: edges, openings, shafts Fall of more than 7 1/2 feet 8 CCR §1670
Residential-type framing (houses and light commercial) 6 feet or more 8 CCR §1716.2
Residential-type roofing, 0:12 through 7:12 6 feet or more 8 CCR §1731
Residential-type roofing steeper than 7:12 Any height 8 CCR §1731
Non-residential roofing Roofs more than 20 feet high 8 CCR §1730
Trusses, beams or plates 4 inches nominal or wider, guardrails impracticable More than 15 feet 8 CCR §1669
Safety nets where other systems are clearly impractical 25 feet or more 8 CCR §1671

The residential framing and roofing heights became 6 feet on July 1, 2025. Older study material shows higher numbers. (8 CCR §1716.2, 8 CCR §1731, 8 CCR §1670)

Personal fall arrest. Rig it so the worker cannot free fall more than 6 feet. Anchorages support at least 5,000 pounds per attached worker, unless they are part of a complete system designed with a safety factor of at least two under a qualified person. A competent person inspects each system at least twice a year, and any part that has stopped a fall is removed from service at once. A positioning device limits free fall to 2 feet. (8 CCR §1670)

Walls raised by hand. Before a wall 15 feet or more tall is raised by hand, install temporary restraints, such as floor cleats or straps on the bottom plate. (8 CCR §1716.2)

Guardrails, openings and stairs

  • Guardrails are required on open sides of platforms and other elevations 7 1/2 feet or more above the ground or floor. (8 CCR §1621)
  • The top rail is 42 to 45 inches above the walking surface, with a mid-rail halfway. It resists 200 pounds and may not deflect below 39 inches under that load; the mid-rail resists 150 pounds. Wood posts are at least 2x4, no more than 8 feet apart. (8 CCR §1620)
  • A toeboard is at least 4 inches (nominal) high, with no more than 1/4 inch of clearance above the floor. (8 CCR §1621)
  • A floor-opening cover supports the greater of 400 pounds or twice the load that may be on any one square foot, is secured, and is marked with letters at least 1 inch high. A wall opening is guarded when the drop is more than 4 feet and the bottom of the opening is less than 3 feet above the working surface. (8 CCR §1632)
  • A stairway, ramp or ladder is required at any break in elevation of 18 inches or more in a frequently used passageway. A building 2 or more stories, or 24 feet or more, needs stairways; above 3 stories or 36 feet, 2 or more. (8 CCR §1629)
  • Stair rails on a job stairway are 34 to 38 inches above the tread, measured at the riser face, and a temporary handrail has at least 3 inches of clearance from the wall. (8 CCR §1626)

Ladders and scaffolds

  • A ladder's side rails extend at least 36 inches above the landing. Set the foot out one-quarter of the working length: a 20-foot working length puts the foot 5 feet from the wall. Do not stand on the top 3 rungs of a single or extension ladder without a firm handhold or fall protection. A damaged ladder is tagged "Dangerous, Do Not Use." (8 CCR §3276)
  • A scaffold supports its own weight plus 4 times its maximum intended working load. A plank overhangs its support no more than 18 inches unless access is blocked or the other end is anchored. (8 CCR §1637)
  • A free-standing rolling scaffold that is not guyed or tied has a least base dimension of at least one-third of its height. A 5-by-7-foot base allows 15 feet. (8 CCR §1646)
  • A horse scaffold is no more than 10 feet or 2 tiers high (8 CCR §1647); a ladder-jack platform no more than 16 feet (8 CCR §1648).

Tools, PPE, noise and heat

  • Only a qualified person with a valid operator's card for that tool runs a powder-actuated tool, except a trainee under direct supervision (8 CCR §1685). After a misfire, hold the tool against the work surface for 30 seconds (8 CCR §1691).
  • Disconnect a pneumatic nailer from the air supply at the tool before clearing a jam (8 CCR §1704).
  • PPE must be selected so it properly fits each worker (8 CCR §1514). Near conductors over 600 volts, only a Class E hard hat is allowed (8 CCR §3381). Eye protection needs side shields when the hazard also comes from the side (8 CCR §3382).
  • The noise limit is 90 dBA for 8 hours, halved for each 5 dBA more: 95 dBA for 4 hours, 100 dBA for 2. Above the table, the employer first uses feasible administrative or engineering controls, then hearing protection. (8 CCR §5096)
  • Outdoor heat: provide 1 quart of water per worker per hour for the shift when water is not plumbed; shade is up whenever the temperature is above 80°F; high-heat procedures start at 95°F; a cool-down rest is never less than 5 minutes plus the time to reach the shade. A crew of 6 on a 10-hour shift needs 60 quarts, or 15 gallons. (8 CCR §3395)

Dust, lead, asbestos and power lines

  • Silica. The PEL is 50 micrograms per cubic meter (8-hour average). Clean up with wet sweeping or a HEPA-filtered vacuum, not dry sweeping. (8 CCR §1532.3)
  • Lead. In construction the PEL is 10 micrograms per cubic meter and the action level 2, since January 1, 2025. Older material shows higher numbers. Notice of trigger-task lead work must reach the Cal/OSHA district office at least 24 hours before work starts. (8 CCR §1532.1)
  • Asbestos. The PEL is 0.1 fiber per cubic centimeter (8-hour average). (8 CCR §1529)

For trench rules (cave-in protection at 5 feet, soil types and slopes), see the earthwork questions; the soil classes and slopes are in Title 8 appendices (8 CCR §1541.1, App. B).

Transportation and traffic control

Where traffic or hauling at a job that encroaches on a public street creates a hazard to workers, Cal/OSHA requires traffic controls that conform to the California MUTCD. Workers on foot exposed to traffic wear high-visibility garments, retroreflective and visible from at least 1,000 feet at night. (8 CCR §1598) Caltrans' current manual is the CA MUTCD 2026, effective January 18, 2026; CSLB's study guide still lists the 2014 edition, so section numbers in older books may not match.

The four areas of a work zone, in the order a driver reaches them: advance warning, transition, activity and termination (CA MUTCD §6B.03). Keep work, equipment and materials out of the buffer space of the activity area (CA MUTCD §6B.06).

Advance warning. On urban streets the warning sign nearest the work goes about 4 to 8 times the speed limit (in feet) ahead; on rural highways about 8 to 12 times (CA MUTCD §6B.04). On a 30 mph street that is about 120 to 240 feet.

Taper length (W is the offset width in feet, S the speed in mph) (CA MUTCD §6B.08):

Speed Merging taper length L Source
40 mph or less W × S² ÷ 60 CA MUTCD §6B.08
45 mph or more W × S CA MUTCD §6B.08

An 11-foot lane at 30 mph gives 11 × 900 ÷ 60 = 165 feet. A shifting taper is about 1/2 L and a shoulder taper about 1/3 L.

Devices. Space channelizing devices no farther apart, in feet, than 1 times the speed limit on a taper and 2 times on a tangent (CA MUTCD §6K.01). Cones are at least 28 inches high at night on any highway (CA MUTCD §6K.03). Metal drums may not be used (CA MUTCD §6K.06).

Flaggers. Cal/OSHA requires flaggers where barricades and signs cannot control moving traffic, trained before they are assigned (8 CCR §1599). The STOP/SLOW paddle is the primary signaling device and is at least 18 inches wide (CA MUTCD §6D.02); in California flags are for emergencies only (CA MUTCD §6D.03). The flag transfer method may not be used in California (CA MUTCD §6E.03).

Pedestrians. The California Building Code sets protection by the height of construction and its distance to the lot line. Construction 8 feet high or less and less than 5 feet from the lot line needs construction railings; taller construction close to the lot line needs a barrier and a covered walkway (2025 CBC §3306.1). A walkway is at least 4 feet wide (2025 CBC §3306.2), and materials may not be placed within 20 feet of a street intersection (2025 CBC §3308.1.1).

Loads on the road. Aggregate loads are covered unless they stay 6 inches below the upper edge where they touch the sides, front and back, and the peak does not rise above the upper edge (Veh. Code §23114); loads for disposal or recycling are totally covered (Veh. Code §23115). A load that extends 4 feet or more past the rear carries a red or fluorescent orange flag at least 18 inches square by day and two red lights at night (Veh. Code §24604).

Environmental safety

  • Small sites. A residential project that disturbs less than 1 acre, and is not part of a larger plan, manages storm water during construction with retention basins, a filtering barrier such as a wattle, or a local storm water ordinance (2025 CALGreen §4.106.2).
  • 1 acre or more. A project that disturbs 1 acre or more, or less as part of a larger common plan of 1 acre or more, needs coverage under the statewide Construction Stormwater General Permit (State Water Board). The permit requires a SWPPP, and construction may begin once SMARTS issues the WDID number (CGP §III.A). Waste containers are covered at the end of every business day and during rain (CGP Att. D §II.A). Risk Level 2 and 3 sites sample their discharges, with numeric action levels of pH 6.5 to 8.5 and turbidity of 250 NTU (CGP §IV.C.3).
  • Construction waste. New homes recycle or salvage at least 65 percent of nonhazardous construction and demolition waste; excavated soil and land-clearing debris are excepted (2025 CALGreen §4.408.1).
  • Lead renovation (EPA). Paid work that disturbs paint in housing built before 1978 is done by an EPA-certified firm (40 CFR §745.82). Minor repair is 6 square feet or less per room inside, or 20 square feet or less outside, and never includes window replacement (40 CFR §745.83). Give the owner the EPA pamphlet no more than 60 days before work starts (40 CFR §745.84). Open-flame burning of painted surfaces is prohibited (40 CFR §745.85).
  • Asbestos registration. An employer registers with Cal/OSHA before asbestos-related work involving 100 square feet or more of asbestos-containing construction material (8 CCR §341.6), and notifies the district office before each job (8 CCR §341.9).
  • Chemicals and paint. Keep a safety data sheet for each hazardous chemical where workers can reach it during each shift (8 CCR §5194). Leftover paint does not go down a drain; containers of 5 gallons or less can go to a PaintCare drop-off site (CalRecycle).

Traps to watch for

  • Which height? Read the kind of work first: commercial ductwork at a mezzanine edge is general construction (more than 7 1/2 feet); a house roof at 4:12 is residential-type roofing (6 feet).
  • Old numbers. The 6-foot residential heights date from July 1, 2025, and the 10-microgram lead limit from January 1, 2025. A book that shows other numbers is out of date.
  • Which lead rule? EPA's renovation rule uses 6 and 20 square feet; Cal/OSHA's notice rule is about worker exposure. Read which rule the question names.
  • Round up. Toilets, washing stations and extinguishers are figured "per 20" or "per 3,000 square feet, or fraction": any remainder needs one more.

Law and Business has its own Safety section, with the IIPP and injury reports seen from the employer's side: see the Law and Business safety notes. For answered practice questions on this section, start with personnel safety.