Skip to content
CalContractorPrep
Menu

Finish Trades: Paint, Tile, Flooring, Cabinets, Drywall, Windows and Landscaping for the B Exam

Section 4 of 5, about 20% of the B examUpdated

CSLB's subtopics: Painting, staining, coating, and interior wall covering, Tile and stone, Floor covering, Cabinetry and millwork, Plaster, drywall, and ceilings, Windows, skylights, and doors, Landscaping.

Finish Trades is about 20% of the CSLB General Building (B) exam. CSLB's B study guide splits it into seven subtopics: painting, staining, coating and interior wall covering; tile and stone; floor covering; cabinetry and millwork; plaster, drywall and ceilings; windows, skylights and doors; and landscaping. Much of this work needs no building permit, but it must still meet the code (2025 CRC §R105.2).

The rules come from the 2025 California Residential Code (CRC) and Building Code (CBC), CALGreen's limits on paints, adhesives and composite wood, the Energy Code, the Plumbing Code for showers, the state's water-efficient landscape rules in Title 23, and the federal lead renovation rule. Accessibility questions use CBC Chapter 11B. This note gives the numbers each subtopic leans on and the section each one comes from.

Painting, staining, coating, and interior wall covering

VOC limits

CALGreen caps the volatile organic compounds (VOC) in architectural coatings, in grams per liter (2025 CALGreen §4.504.2.2):

Coating VOC limit Source
Flat 50 g/L 2025 CALGreen Table 4.504.3
Nonflat 100 g/L 2025 CALGreen Table 4.504.3
Nonflat-high gloss 150 g/L 2025 CALGreen Table 4.504.3
Primers, sealers and undercoaters 100 g/L 2025 CALGreen Table 4.504.3
Stains 250 g/L 2025 CALGreen Table 4.504.3
Wood coatings 275 g/L 2025 CALGreen Table 4.504.3
Clear shellacs (the highest) 730 g/L 2025 CALGreen Table 4.504.3

A coating with no specialty category is treated as flat, nonflat or nonflat-high gloss. When the enforcing agency asks for proof, it can include the manufacturer's product specification or a check of the product containers on site. (2025 CALGreen §4.504.2.4)

Finishes and fire

  • Flame spread. Wall and ceiling finishes have a flame spread index of 200 or less and a smoke-developed index of 450 or less. Trim, doors and window frames are exempt; material thinner than 1/28 inch cemented to the surface is exempt. (2025 CRC §R302.9)
  • Paneling. Wood veneer and hardboard paneling goes on framing no more than 16 inches on center; paneling thinner than 1/4 inch needs a gypsum backer of at least 3/8 inch. (2025 CRC §R702.5)

Lead-safe work

  • Who. Paid work that disturbs paint in housing or child-occupied facilities built before 1978 is done by an EPA-certified firm. (40 CFR §745.82)
  • Minor repair. No more than 6 square feet per room inside, or 20 square feet outside, and never window replacement. (40 CFR §745.83)
  • Pamphlet. Given to the owner no more than 60 days before work starts. (40 CFR §745.84)
  • Work area. Cover the floor 6 feet beyond the work inside, and the ground 10 feet beyond it outside; close doors and windows within 20 feet outside. No open-flame burning, and a heat gun stays below 1,100°F. (40 CFR §745.85)
  • Records are kept 3 years. (40 CFR §745.86)
  • Workers. Cal/OSHA's construction lead PEL is 10 micrograms per cubic meter, with an action level of 2, since January 1, 2025. (8 CCR §1532.1)

Estimating. 2,400 square feet with two coats at 400 square feet per gallon per coat needs 4,800 ÷ 400 = 12 gallons (common building practice).

Tile and stone

  • Shower walls. In a home, tub-shower and shower walls have a nonabsorbent surface at least 6 feet above the floor (2025 CRC §R327.2). In commercial buildings, the shower wall surface runs at least 72 inches above the drain inlet (2025 CBC §1210.2.4).
  • Commercial toilet rooms. The floor finish runs at least 4 inches up the wall, and walls within 2 feet of water closets and urinals are smooth and nonabsorbent to at least 4 feet above the floor. (2025 CBC §1210.2)
  • Backers. Tile in tub and shower areas goes on a backer that meets ASTM C1178, C1278, C1288 or C1325 (2025 CRC §R702.4.2). Water-resistant gypsum backing board may not go over a Class I or Class II vapor retarder in a tub or shower compartment (2025 CRC §R702.3.7).
  • Installation standards. Ceramic tile follows the ANSI A108, A118, A136.1 and A137.1 standards. (2025 CRC §R702.4.1)
  • Shower pan. The curb is at least 1 inch lower than the sides and back, the receptor is 2 to 9 inches deep from the top of the dam to the top of the drain, and the floor slopes 1/8 to 1/2 inch per foot to the drain. (2025 CPC §408.6)
  • Glass near a tub or shower is safety glazing when its bottom edge is less than 60 inches above the standing surface, unless it is 60 inches or more away measured across. (2025 CRC §R324.4.5)
  • Adhesive VOC. Ceramic tile adhesive is limited to 65 g/L. (2025 CALGreen §4.504.2.1)
  • Silica. A handheld wet saw used indoors needs a respirator of at least APF 10 for any length of time; outdoors, only after 4 hours. A stationary wet masonry saw needs none. (8 CCR §1532.3)
  • Stone veneer. Anchored veneer ties are no more than 32 inches apart across and 24 inches up, and weepholes no more than 33 inches apart, at least 3/16 inch across. (2025 CRC §R703.8)

Floor covering

  • Subfloor. Subflooring may be left out only where joists are 16 inches on center or less and 1-inch nominal tongue-and-groove wood strip flooring runs across them. (2025 CRC §R503.1.1)
  • Underlayment. Particleboard underlayment is Type PBU, at least 1/4 inch thick. (2025 CRC §R503.3.2)
  • Emissions. All carpet and carpet cushion meet the CDPH emissions test; at least 80% of resilient flooring area does. (2025 CALGreen §4.504.3, §4.504.4)
  • Adhesive VOC. Indoor carpet, carpet pad, subfloor and cove base adhesives 50 g/L; ceramic tile 65; wood flooring 100. One adhesive used on two different materials takes the higher limit. (2025 CALGreen §4.504.2.1)
  • Floor coatings are limited to 100 g/L. (2025 CALGreen §4.504.2.2)

Accessible floors

Rule Number Source
Carpet pile height 1/2 inch maximum 2025 CBC §11B-302.2
Openings in a floor No 1/2-inch sphere passes 2025 CBC §11B-302.3
Vertical change in level Up to 1/4 inch 2025 CBC §11B-303.2
Beveled change in level Over 1/4 up to 1/2 inch, no steeper than 1:2 2025 CBC §11B-303.3
Larger change in level Over 1/2 inch is ramped 2025 CBC §11B-303.4
Clear floor space 30 by 48 inches 2025 CBC §11B-305.3

Estimating. A square yard is 9 square feet. A 1,200-square-foot floor plus 10% waste, in 15-square-foot boxes, needs 1,320 ÷ 15 = 88 boxes (common building practice).

Cabinetry and millwork

  • Permit. Cabinets and countertops need no building permit but must meet the code. (2025 CRC §R105.2)
  • Formaldehyde limits for composite wood: hardwood plywood 0.05 ppm, particleboard 0.09, MDF 0.11, thin MDF (5/16 inch or less) 0.13. (2025 CALGreen §4.504.5)
  • Dishwasher air gap. Its flood-level mark is at or above the flood level of the sink or drainboard, whichever is higher. (2025 CPC §807.3)
  • Handrails. A round handrail is 1 1/4 to 2 inches in diameter; a noncircular one has a perimeter of 4 to 6 1/4 inches and a cross section no more than 2 1/4 inches. Height is 34 to 38 inches. (2025 CRC §R320.6, §R320.2)
  • Board feet. Thickness (inches) × width (inches) × length (feet) ÷ 12 (common building practice).

Accessible counters and reach

Rule Number Source
Unobstructed reach 48 inches high maximum, 15 inches low minimum 2025 CBC §11B-308.2.1
Lavatory or sink Rim or counter 34 inches high maximum 2025 CBC §11B-606.3
Kitchen work surface At least 30 inches wide, 34 inches high maximum 2025 CBC §11B-804.3
Knee clearance From 9 to 27 inches above the floor, no more than 25 inches deep 2025 CBC §11B-306.3
Protruding objects Wall-mounted, 27 to 80 inches high: 4 inches maximum 2025 CBC §11B-307.2
Mirror over a lavatory Bottom 40 inches maximum 2025 CBC §11B-603.3
Operable parts 5 pounds of force maximum 2025 CBC §11B-309.4

Plaster, drywall, and ceilings

  • Framing. Wood framing for gypsum board is at least 2 inches nominal; wood furring is at least 1x2 over framing 24 inches on center or less. (2025 CRC §R702.3.2)
  • Fastening. On walls framed 16 inches on center, nails at 8 inches and screws at 16 inches; on ceilings, nails at 7 inches and screws at 12 inches. On walls framed 24 inches on center, screws drop to 12 inches. Ceiling board on 24-inch framing runs perpendicular only. (2025 CRC Table R702.3.5)
  • Screws reach 5/8 inch into wood and 3/8 inch through thin steel. (2025 CRC §R702.3.5.1)
  • Textured ceilings. Under a water-based texture, board runs perpendicular to the framing: 1/2 inch at 16 inches on center, 5/8 inch at 24 inches, or 1/2-inch sag-resistant board. (2025 CRC §R702.3.5)
  • Fire separations. Garage side of the house wall 1/2-inch gypsum; garage ceiling with living space above 5/8-inch Type X (2025 CRC §R302.6), fastened 6 inches on center (2025 CRC Table R702.3.5). An enclosed space under stairs gets 1/2-inch gypsum (2025 CRC §R302.7).
  • Inspection. The lath and gypsum board inspection is made after the board is up and before taping or plaster, so the fasteners can be seen. (2025 CRC §R109.1.4.2)
  • Plaster. Interior plaster takes 3 coats over metal lath and 2 over other bases; veneer plaster is one coat, no more than 3/16 inch (2025 CRC §R702.2.1). Gypsum plaster over metal lath is 5/8 inch thick (2025 CRC Table R702.1(1)). Interior cement plaster waits 48 hours before the finish coat (2025 CRC §R702.2.2.2), and a brown coat is flat within 1/4 inch under a 5-foot straightedge (2025 CBC §2512.5).

Estimating. A 12-by-16-foot room with 8-foot ceilings has 448 square feet of wall and 192 of ceiling: 640 ÷ 32 = 20 sheets of 4x8 board, before waste (common building practice).

Windows, skylights, and doors

Escape openings and fall protection

  • Emergency escape and rescue openings have a net clear area of at least 5.7 square feet (5 at a grade floor), at least 24 inches high and 20 inches wide, with the sill no more than 44 inches above the floor. (2025 CRC §R319.2)
  • Area wells are at least 9 square feet and 36 inches each way; a well deeper than 44 inches needs a ladder or steps. (2025 CRC §R319.4.1)
  • Window fall protection applies where the opening is less than 24 inches above the floor and more than 72 inches above the grade outside. (2025 CRC §R321.2.1)

Safety glazing

Glass in these places must be safety glazing (2025 CRC §R324.4):

Location Hazardous when Source
Doors Always (small openings excepted) 2025 CRC §R324.4.1
Next to a door Within 24 inches of the door and bottom edge under 60 inches 2025 CRC §R324.4.2
Windows Over 9 square feet, bottom under 18 inches, top over 36 inches, and a walking surface within 36 inches 2025 CRC §R324.4.3
Tubs, showers, pools Bottom edge under 60 inches above the standing surface 2025 CRC §R324.4.5
Stairs and ramps Bottom edge under 36 inches above the walking surface 2025 CRC §R324.4.6

A window must meet all four of its conditions to be hazardous.

Doors, energy and flashing

  • Egress door. Side-hinged, at least 32 inches clear width and 78 inches clear height. (2025 CRC §R318.2)
  • Landings. At least 36 inches deep and as wide as the door; the floor at the required egress door is no more than 1 1/2 inches below the threshold. (2025 CRC §R318.3)
  • Garage-to-house door. 1 3/8-inch solid wood or steel, or 20-minute rated, self-closing and self-latching. (2025 CRC §R302.5.1)
  • Skylights. A skylight on a roof flatter than 3:12 sits on a curb at least 4 inches high. (2025 CRC §R324.6.8)
  • Energy. New single-family windows have a weighted average U-factor of 0.40 or less (2025 Energy Code §150.0(q)). Flashing is installed so water drains to the outside; self-adhered flashing meets AAMA 711 (2025 CRC §R703.4).
  • Accessible doors. At least 32 inches clear, thresholds no more than 1/2 inch, hardware 34 to 44 inches high, and no more than 5 pounds to open an ordinary hinged, sliding or folding door (fire doors up to 15 pounds). (2025 CBC §11B-404.2)

Landscaping

  • Which rule. A new home's landscape follows the local water-efficient landscape ordinance or the state Model Water Efficient Landscape Ordinance (MWELO), whichever is more stringent. (2025 CALGreen §4.304.1)
  • When MWELO applies. New construction with 500 square feet or more of landscape, or a rehabilitated landscape of 2,500 square feet or more. (23 CCR §491)
  • Soil and mulch. Compost at 4 cubic yards per 1,000 square feet to a depth of 6 inches, and at least 3 inches of mulch on exposed soil. (23 CCR §493.2)
  • Plants and turf under the prescriptive option: at least 75% of a residential landscape in climate-adapted plants, and no more than 25% turf. No turf on slopes steeper than 25% or in parkways under 10 feet wide. (23 CCR §492)
  • Irrigation. Overhead spray stays 24 inches from non-pervious surfaces; areas under 10 feet wide get subsurface or no-overspray irrigation. (23 CCR §493.2.2) Overhead watering runs between 8:00 p.m. and 10:00 a.m. (23 CCR §493.4)
  • Water budget. The maximum ETAF is 0.55 for residential and 0.45 for non-residential landscapes. (23 CCR §493.3)
  • Grading. The ground falls at least 6 inches in the first 10 feet from the house. (2025 CRC §R401.3)

A 50-by-40-foot bed needs 2,000 ÷ 1,000 × 4 = 8 cubic yards of compost.

Traps to watch for

  • No permit is not no code. Painting, tile, flooring and cabinets need no permit but must still meet every rule above.
  • Which shower height? 6 feet above the floor in a home (CRC); 72 inches above the drain inlet in a commercial building (CBC).
  • 6, 10 or 20 feet? In lead-safe work, 6 feet of floor cover inside, 10 feet of ground cover outside, windows closed within 20 feet.
  • Screw spacing. 16 inches only on walls framed 16 inches on center; 12 inches on 24-inch framing and on ceilings.
  • 44 inches twice. The highest escape opening sill, and the area well depth that calls for a ladder.
  • 500 or 2,500? MWELO reaches new landscapes at 500 square feet and rehabilitated ones at 2,500.

For answered practice questions on this section, start with painting and wall covering, tile and stone, floor covering, cabinetry and millwork, plaster, drywall and ceilings, windows, skylights and doors and landscaping. Lead and silica rules for workers are also in the Safety notes, and the lead-safe work practices guide covers the renovation rule step by step.

Test yourself

Try 25 free General Building practice questions from all five sections. Each answer explains the rule and names the code section it comes from. No sign-up.

See what the General Building exam covers