Under the 2025 California Residential Code (CRC), a house footing is never smaller than 12 inches wide and 6 inches thick (2025 CRC §R403.1.1) and goes at least 12 inches below undisturbed ground (2025 CRC §R403.1.4). Rebar cast against the earth needs 3 inches of concrete cover (2025 CRC §R403.1.3.5.3). Sill plates are held down with 1/2-inch anchor bolts at no more than 6 feet on center (2025 CRC §R403.1.6). A slab-on-ground is at least 3 1/2 inches thick, over a 6-mil vapor retarder lapped 6 inches where one is required (2025 CRC §R506.1, §R506.3.3).
This page covers the concrete side of a house foundation for the General Building (B) exam: concrete strength, footing size and depth, seismic rebar, cover, anchor bolts, foundation walls, slabs, inspections and the arithmetic of ordering concrete. Code rules are in our own words with the 2025 section to look up; mix and finishing tips that are not code rules are marked as common practice.
Concrete strength
Strength is measured in pounds per square inch (psi) at 28 days. The CRC minimums depend on what the concrete is and on the weathering region (2025 CRC §R402.2):
| Concrete | Negligible weathering | Moderate | Severe |
|---|---|---|---|
| Foundations, basement walls and other concrete not exposed to weather | 2,500 psi | 2,500 psi | 2,500 psi |
| Interior slabs on grade and basement slabs (not garage floors) | 2,500 psi | 2,500 psi | 2,500 psi |
| Walls and other vertical concrete exposed to weather | 2,500 psi | 3,000 psi | 3,000 psi |
| Porches, carport slabs, steps exposed to weather, and garage floors | 2,500 psi | 3,000 psi | 3,500 psi |
- Air entrainment. The 3,000 and 3,500 psi entries must be air-entrained, with total air content of 5 to 7% by volume. A steel-troweled garage floor may drop to 3% air if its specified strength is raised to at least 4,000 psi. (2025 CRC §R402.2)
- Foundation walls by seismic category. At least 2,500 psi in Seismic Design Categories (SDC) A, B and C, and 3,000 psi in SDC D0, D1 and D2. (2025 CRC §R404.1.3.3.1)
- Commercial foundations. The California Building Code (CBC) asks 2,500 psi in SDC A to C and for light-frame Group R or U buildings of two stories or less in SDC D to F; 3,000 psi for other structures in SDC D to F. A three-story steel office building in SDC D needs 3,000 psi footings. (2025 CBC §1808.8.1)
Footing size and depth
- Minimum size. 12 inches wide and 6 inches thick, whatever the tables give. The footing projects at least 2 inches past the wall, and no more than its own thickness. (2025 CRC §R403.1.1)
- Bearing. Exterior walls sit on continuous footings bearing on undisturbed natural soil or engineered fill. In SDC D0, D1 and D2, exterior walls and required interior braced wall panels sit on continuous solid or fully grouted masonry or concrete footings. (2025 CRC §R403.1)
- Depth. At least 12 inches below the undisturbed ground surface, and protected from frost, for example by going below the frost line. (2025 CRC §R403.1.4) The CBC also asks at least 12 inches deep and 12 inches wide. (2025 CBC §1809.4)
- Slope. The top of a footing is level. The bottom may slope no more than 1 in 10 (10%); step the footing where it would be steeper. (2025 CRC §R403.1.5) Ground sloping 1 in 8 is steeper than 1 in 10, so that footing must be stepped. (2025 CBC §1809.3)
- Frost exemption. Free-standing accessory buildings with an eave height of 10 feet or less need no frost protection up to 600 square feet (light frame) or 400 square feet (other construction). An attached garage does not qualify. (2025 CRC §R403.1.4.1)
Footing sizes for light-frame houses
For a light-frame house with a 20 psf roof live load on 1,500 psf soil, the CRC footing table gives these width × thickness sizes for a building 32 feet wide (2025 CRC §R403.1.1):
| Stories | On a slab-on-grade | Over a crawl space |
|---|---|---|
| 1 | 12 × 6 inches | 12 × 6 inches |
| 2 | 13 × 6 inches | 15 × 6 inches |
| 3 | 16 × 6 inches | 18 × 6 inches |
For each 4 feet of extra building width, add 2 inches of width and 1 inch of depth; a narrower building may reduce by the same steps, but never below 12 × 6 inches. The CBC's own light-frame table is 12 × 6 inches for one floor, 15 × 6 for two and 18 × 8 for three (2025 CBC §1809.7).
Presumptive soil values
Without a full soils report, the CRC assumes these bearing values: crystalline bedrock 12,000 psf; sedimentary and foliated rock 4,000 psf; sandy gravel and gravel 3,000 psf; sands, silty and clayey sands and gravels 2,000 psf; clays and silts 1,500 psf. Where soil under 1,500 psf is likely, a soils investigation sets the value. (2025 CRC §R401.4.1)
Rebar in high seismic areas
These rules apply in SDC D0, D1 and D2, the high seismic categories (2025 CRC §R403.1.3.1):
- Stem wall on a separate footing. At least one No. 4 vertical bar at no more than 4 feet on center, with a standard hook, reaching the bottom of the footing and extending at least 14 inches into the stem wall. Also one No. 4 horizontal bar within 12 inches of the top of the stem wall and one 3 to 4 inches from the bottom of the footing.
- Slab with a turned-down footing. One No. 4 bar at the top and one at the bottom of the footing, or one No. 5 bar or two No. 4 bars in the middle third of the footing depth. A slab poured separately is tied to the footing with No. 3 or larger hooked dowels at no more than 4 feet on center. (2025 CRC §R403.1.3.3)
- Interior footings under bearing walls or braced wall panels, cast with the slab, reach at least 12 inches below the top of the slab. (2025 CRC §R403.1.3.4)
- Steel grade. Minimum yield strength 40,000 psi (Grade 40). (2025 CRC §R403.1.3.5.1)
A bar's number is its diameter in eighths of an inch: a No. 4 bar is 1/2 inch and a No. 5 is 5/8 inch. That is common trade usage, not a code rule.
Concrete cover
Cover is the concrete between the bar and the outside face (2025 CRC §R403.1.3.5.3):
| Where the concrete is | Minimum cover |
|---|---|
| Cast against the earth (a trench with no forms) | 3 inches |
| In removable forms, exposed to earth or weather: No. 5 bars and smaller | 1 1/2 inches |
| In removable forms, exposed to earth or weather: No. 6 bars and larger | 2 inches |
| In removable forms not exposed to earth or weather, or in stay-in-place forms | 3/4 inch |
Bars are tied with wire or set on bar supports so they do not move during the pour. In a slab-on-ground, reinforcement is held between the center and the upper one-third of the slab for the whole pour (2025 CRC §R506.3.4).
Anchor bolts
Wood sill plates, and the sole plates of exterior walls and interior braced wall panels on monolithic slabs, are anchored to the foundation (2025 CRC §R403.1.6):
- Bolts at least 1/2 inch in diameter, spaced no more than 6 feet on center, embedded at least 7 inches into concrete or grouted masonry, in the middle third of the plate width, each with a nut and washer.
- At least two bolts per plate section, with one bolt no more than 12 inches and no less than 7 bolt diameters from each end.
- Bolts may be wet-set, pushed into the concrete while it is still plastic. If a bolt resists or the concrete does not settle around it, vibrate the concrete for full contact.
In SDC D0, D1 and D2, plate washers go on all anchor bolts along required braced wall lines unless approved anchor straps are used, and bolt spacing drops to 4 feet for buildings over two stories (2025 CRC §R403.1.6.1).
Foundation walls
- Height above grade. Concrete and masonry foundation walls extend at least 6 inches above finished grade, or 4 inches where masonry veneer is used. (2025 CRC §R404.1.6)
- Slump. Concrete in removable forms has a slump of no more than 6 inches; in stay-in-place forms it is more than 6 inches. Slump is measured by ASTM C143. (2025 CRC §R404.1.3.3.4)
- Aggregate size. No more than one-fifth of the narrowest form width and three-fourths of the clear space between bars. In a 10-inch wall with 2 inches between bars, 2 inches and 1 1/2 inches: the smaller, 1 1/2 inches, governs. (2025 CRC §R404.1.3.3.3)
- Design required. Walls holding more than 48 inches of unbalanced backfill without lateral support at top or bottom, or facing ground water pressure, are engineered. (2025 CRC §R404.1.1)
Slabs-on-ground
- Thickness at least 3 1/2 inches (2025 CRC §R506.1).
- Fill no deeper than 8 inches of earth or 24 inches of clean sand or gravel, unless approved (2025 CRC §R506.3.1).
- Base course of 4 inches under a slab below grade, except on well-drained Group I soils (2025 CRC §R506.3.2).
- Vapor retarder of 6-mil polyethylene or an approved equal, joints lapped at least 6 inches. Not needed for garages, utility buildings and other unheated accessory structures; unheated storage rooms under 70 square feet and carports; driveways, walks, patios and other flatwork not likely to be enclosed and heated later; or where the building official approves for local site conditions (2025 CRC §R506.3.3).
- Capillary break. Wherever a vapor retarder is required, CALGreen adds a capillary break; one method is a 4-inch base of 1/2-inch or larger clean aggregate with the vapor retarder against the concrete (2025 CALGreen §4.505.2.1).
Inspections, curing and testing basics
- Foundation inspection comes after trenches are dug, forms are set and rebar is in place and supported, but before concrete is placed. Ready-mixed concrete need not be on site. (2025 CRC §R109.1.1)
- Slab inspection comes after in-slab rebar, conduit and piping are in, but before the pour. (2025 CRC §R109.1.1.1)
- Water. Adding water at the truck raises the water-cement ratio, making weaker, less durable concrete with more shrinkage cracking. Get workability from the mix design or approved admixtures. (Common practice.)
- Curing. Keep new concrete moist with wet coverings, ponding or a curing compound for the first several days, most of all on hot, dry, windy days. (Common practice.)
- Control joints are cut about one-quarter of the slab depth: about 1 inch in a 4-inch slab. (Common practice.)
Ordering concrete
Concrete is ordered in cubic yards, and 1 cubic yard is 27 cubic feet. A footing 120 feet long with a 15 × 12-inch footing (1.25 square feet) under an 8 × 18-inch stem wall (1 square foot) is 2.25 × 120 = 270 cubic feet, or 10 cubic yards before waste. For the rebar count, bars at 18 inches across 24 feet make 24 ÷ 1.5 = 16 spaces, so 17 bars with one at each edge. This is estimating practice.
Study advice
Memorize the "12s" (12 × 6 minimum, 12 inches deep, bolts within 12 inches of plate ends), the cover ladder (3, 2, 1 1/2, 3/4) and the slab trio (3 1/2 inches, 6 mil, 6-inch laps). Then work the footing table by stories and slab or crawl space. Safety around rebar and silica is in the Safety notes, and the deck footing rules are in our deck guide. For the rest of this exam section, read the Core Trades notes.