Lead-Safe Work Practices in California: EPA RRP and Cal/OSHA Lead Rules

Section 5 of 5, about 15% of the B exam

Updated

Three sets of lead rules apply to California contractors. The EPA's Renovation, Repair and Painting (RRP) rule covers paid work that disturbs paint in housing built before 1978: the firm must be EPA-certified, and minor repair work that disturbs 6 square feet or less per room inside or 20 square feet or less outside is outside the rule (window replacement and demolition never count as minor) (40 CFR §745.82, 40 CFR §745.83). Cal/OSHA protects the workers: since January 1, 2025 the construction lead limit (PEL) is 10 micrograms per cubic meter and the action level 2 (8 CCR §1532.1). The California Department of Public Health (CDPH) certifies the people who do long-term lead abatement (17 CCR §36100).

This guide takes each rule in turn: who it covers, the numbers it uses and what it requires on the job. It ends with the traps that come from mixing them up. CSLB's B study guide puts lead under environmental safety, and the Cal/OSHA limits also show up in personnel safety questions.

The EPA renovation rule (RRP)

Who and what it covers

  • Target housing. The rule covers renovations done for pay in housing built before 1978 and in child-occupied facilities built before 1978. Housing for the elderly or people with disabilities, and 0-bedroom units, are left out unless a child under 6 lives there or is expected to. (40 CFR §745.82, 40 CFR §745.103)
  • Certified firm. A firm paid to do the work must be EPA-certified. The work is directed by a certified renovator and done by certified renovators or by workers trained by one. A "firm" includes a sole proprietor, so a one-person painting business needs certification too. (40 CFR §745.82, 40 CFR §745.83)
  • When it does not apply. The rule does not apply where a certified inspector, risk assessor or certified renovator has properly found the affected parts free of lead-based paint. Lead-based paint means lead at or above 1.0 milligram per square centimeter or 0.5 percent by weight. (40 CFR §745.82)
  • Homeowners. People working on their own home are generally not covered, unless they rent out any part of it, run a child care center in it, or buy, renovate and sell homes for profit. (40 CFR §745.82)

Minor repair and maintenance

Minor repair and maintenance is outside the rule. It is work that disturbs 6 square feet or less of painted surface per room inside, or 20 square feet or less outside, with no prohibited practices. It never includes window replacement or demolition of painted surfaces, however small. Jobs in the same room within 30 days count as one job. (40 CFR §745.83)

Job Paint disturbed Covered by the rule? Source
Patch and repaint a wall in one room 5 square feet inside No: 6 square feet or less 40 CFR §745.83
Scrape exterior trim 15 square feet outside No: 20 square feet or less 40 CFR §745.83
Scrape exterior trim 30 square feet outside Yes: over 20 square feet 40 CFR §745.83
Replace one window 4 square feet Yes: window replacement never counts as minor 40 CFR §745.83

Before the work: the pamphlet

Give the owner the EPA lead hazard pamphlet no more than 60 days before the work starts in a dwelling unit. Get a written acknowledgment, or a certificate of mailing at least 7 days before the work. If the owner does not live there, give it to an adult occupant too. (40 CFR §745.84)

On the job: work practices

  • Inside, cover the floor with taped-down plastic at least 6 feet beyond the surfaces being worked on. (40 CFR §745.85)
  • Outside, cover the ground at least 10 feet beyond the work, and close doors and windows within 20 feet. Use larger distances where needed to contain the dust. (40 CFR §745.85)
  • Prohibited: open-flame burning or torching of painted surfaces. (40 CFR §745.85)
  • Restricted: power sanders, grinders and similar tools only with a shroud and HEPA vacuum attachment; a heat gun only below 1,100°F. (40 CFR §745.85)

After the work: records and certification

  • Keep the records that show compliance for 3 years after the job is finished. Give the owner the compliance information when the final invoice is delivered or within 30 days of completion, whichever is earlier. (40 CFR §745.86)
  • A firm's certification lasts up to 5 years; apply to re-certify at least 90 days before it runs out. (40 CFR §745.89)
  • A renovator stays certified by taking a refresher within 5 years. A refresher with hands-on training certifies for 5 years; one without it, for 3 years. (40 CFR §745.90)

Cal/OSHA's lead standard for construction workers

Cal/OSHA's construction lead standard covers demolition, removal, renovation, repair and painting work wherever a worker may be exposed to lead. It was amended effective January 1, 2025, so older study material shows higher limits. (8 CCR §1532.1)

The limits

Limit Number Source
Permissible exposure limit (PEL), 8-hour average 10 micrograms per cubic meter of air 8 CCR §1532.1
Action level, 8-hour average 2 micrograms per cubic meter of air 8 CCR §1532.1
Abrasive blasting, until January 1, 2030 25 micrograms per cubic meter of air 8 CCR §1532.1

Exposure at or above the action level starts duties such as exposure monitoring and medical surveillance. The PEL is the most a worker may be exposed to as an 8-hour average. (8 CCR §1532.1)

Trigger tasks and interim protection

Some tasks are presumed to expose workers above the PEL until the employer measures the actual exposure. Where lead paint is present, the lowest level includes manual demolition (such as drywall), manual scraping and heat gun work. Higher levels include manual sanding, power tool sanding or grinding, abrasive blasting, welding, torch cutting and torch burning. (8 CCR §1532.1)

Until the exposure is measured, workers on trigger tasks get interim protection: respirators, protective clothing, change areas, eating areas, regulated work areas, blood lead testing and training. Workers on the highest-level tasks also get showers. (8 CCR §1532.1)

The 24-hour notice

Before lead work that includes a trigger task, the nearest Cal/OSHA district office must receive written notice at least 24 hours before the work starts. No notice is needed when: (8 CCR §1532.1)

  • less than 100 square feet or 100 linear feet of lead-containing material will be disturbed;
  • the only trigger task is torch cutting or welding for no more than 1 hour in a shift; or
  • the material has less than 0.5 percent lead (5,000 parts per million, or 1.0 milligram per square centimeter).

For unforeseen urgent work starting within 24 hours, a phone call before work starts is allowed, followed by written notice within 24 hours. (8 CCR §1532.1)

Example: A crew will hand-scrape lead paint from 300 square feet of walls next week. Manual scraping is a trigger task and 300 square feet is over 100, so the district office must receive the notice at least 24 hours before work starts.

California's lead abatement rules (CDPH)

Abatement is work designed to reduce or eliminate lead hazards or lead-based paint in public and residential buildings. It is a different job from renovation that happens to disturb paint.

  • Who may do it. Abatement designed to last 20 years or more is done only by a CDPH-certified lead supervisor or certified lead worker, and a certified supervisor is on site during work site preparation and cleanup. (17 CCR §36100)
  • Notice. Before abatement, the person doing it fills out CDPH form 8551 (Abatement of Lead Hazards Notification), posts it at every entrance to the work area, and delivers it to CDPH at least 5 days before the work starts, except for abatement done in response to an identified case of lead poisoning. (17 CCR §36100)
  • Certification. CDPH certifies lead supervisors, inspector/assessors, project monitors, workers and sampling technicians. Certified people take refresher training every 24 months.

Which rule is the question about?

Question names Rule Key numbers Source
Pre-1978 home, renovation, pamphlet, certified firm EPA RRP 1978; 6 and 20 square feet; 60 days; 6 and 10 feet of plastic 40 CFR Part 745
Worker exposure, PEL, district office notice Cal/OSHA lead standard 10 and 2 micrograms per cubic meter; 24 hours; 100 square feet 8 CCR §1532.1
Abatement, certified lead worker or supervisor CDPH Form 8551; 5 days 17 CCR §36100

Traps to watch for

  • Two different square-foot rules. EPA's minor repair limit is 6 square feet inside and 20 outside. Cal/OSHA's notice exception is 100 square feet or 100 linear feet. Read which rule the question names.
  • Windows are never minor. Replacing one window is covered by the EPA rule even if it disturbs 4 square feet of paint.
  • Old lead limits. Cal/OSHA's construction PEL of 10 and action level of 2 date from January 1, 2025. A book that shows other numbers is out of date.
  • Received, not sent. Cal/OSHA's notice must reach the district office at least 24 hours ahead.
  • Torching is prohibited; heat guns are restricted. Under the EPA rule, open-flame burning or torching of painted surfaces is prohibited; a heat gun is allowed only below 1,100°F.
  • Sole proprietors count. A one-person business paid to disturb paint in a pre-1978 rental needs EPA firm certification.

How to use this guide

Learn the EPA numbers as a set (1978, 6 and 20 square feet, 60 days, 6 and 10 feet, 1,100°F, 3 and 5 years), then the two Cal/OSHA limits and the notice rule. Then answer the practice questions below this guide. Stormwater, construction waste and asbestos, the rest of environmental safety, are in our B exam safety notes.

Read the Section 5 study notes: Safety

Practice questions

Think of your answer first, then open the explanation.

  1. 1. A painting contractor is hired to scrape and repaint the exterior of a house. Under the federal lead renovation rule, the rule applies to target housing built before what year?

    Safety

    • A. 1960
    • B. 1970
    • C. 1978
    • D. 1985
    Show answer

    Correct answer: C

    • A. 1960

      Wrong: not the cutoff year.

    • B. 1970

      Wrong: not the cutoff year.

    • C. 1978

      Correct answer

      Correct: built before 1978 (40 CFR 745.103).

    • D. 1985

      Wrong: not the cutoff year.

    Explanation

    Under 40 CFR 745.82 the lead renovation, repair and painting rule applies to renovations for compensation in target housing and child-occupied facilities. Target housing is housing built before 1978 (40 CFR 745.103), and a child-occupied facility is a building built before 1978 (40 CFR 745.83).

  2. 2. A one-person painting business with no employees is paid to sand painted window trim in a 1965 rental house. No lead inspection has been done. Under the federal lead renovation rule, what is required?

    Safety

    • A. The business must be a certified firm, and the work must be done by or under a certified renovator
    • B. Nothing, because sole proprietors are exempt
    • C. Nothing, as long as the owner signs a waiver
    • D. Only a building permit from the city
    Show answer

    Correct answer: A

    • A. The business must be a certified firm, and the work must be done by or under a certified renovator

      Correct answer

      Correct: certified firm and certified renovator (40 CFR 745.81, 745.82).

    • B. Nothing, because sole proprietors are exempt

      Wrong: the rule covers sole proprietors who are paid for the work.

    • C. Nothing, as long as the owner signs a waiver

      Wrong: the federal rule has no owner-waiver for this paid work.

    • D. Only a building permit from the city

      Wrong: a building permit does not satisfy the federal lead rule.

    Explanation

    40 CFR 745.82 applies the rule to renovations for compensation in housing built before 1978. Under 40 CFR 745.81, a firm may not perform such renovations without EPA certification, and the work must be directed by a certified renovator and done by certified renovators or workers trained by one. A firm includes a sole proprietorship or an individual doing business (40 CFR 745.83). The rule does not apply only where a certified inspector, risk assessor or certified renovator has determined the components are free of lead-based paint, which has not been done here.

  3. 3. A contractor will replace one window in a 1960 house. Only about 4 square feet of painted surface will be disturbed. Under the federal lead renovation rule, does the minor repair and maintenance exception apply?

    Safety

    • A. Yes, because less than 6 square feet is disturbed
    • B. Yes, because the work is on the exterior and under 20 square feet
    • C. No, because window replacement never qualifies as minor repair and maintenance
    • D. No, because any work on a pre-1978 house is always covered
    Show answer

    Correct answer: C

    • A. Yes, because less than 6 square feet is disturbed

      Wrong: the square-foot limits do not save window replacement.

    • B. Yes, because the work is on the exterior and under 20 square feet

      Wrong: window replacement is excluded regardless of area.

    • C. No, because window replacement never qualifies as minor repair and maintenance

      Correct answer

      Correct: window replacement never qualifies (40 CFR 745.83).

    • D. No, because any work on a pre-1978 house is always covered

      Wrong: small jobs that are not window replacement or demolition can qualify as minor repair.

    Explanation

    40 CFR 745.83 excludes window replacement (and demolition of painted surface areas) from minor repair and maintenance, no matter how little paint is disturbed. So the renovation rule applies.

    Source

  4. 4. During a renovation of a pre-1978 house, which paint removal method is prohibited by the federal lead renovation rule?

    Safety

    • A. Wet scraping by hand
    • B. Using a heat gun below 1,100 degrees Fahrenheit
    • C. Open-flame burning or torching of painted surfaces
    • D. Using a power sander with a shroud and HEPA vacuum attachment
    Show answer

    Correct answer: C

    • A. Wet scraping by hand

      Wrong: hand scraping is not on the prohibited list.

    • B. Using a heat gun below 1,100 degrees Fahrenheit

      Wrong: heat guns are allowed below 1,100 degrees F.

    • C. Open-flame burning or torching of painted surfaces

      Correct answer

      Correct: open-flame burning or torching is prohibited (40 CFR 745.85).

    • D. Using a power sander with a shroud and HEPA vacuum attachment

      Wrong: allowed when shrouded with a HEPA attachment.

    Explanation

    40 CFR 745.85 prohibits open-flame burning or torching of painted surfaces. Power sanders and grinders are allowed only with a shroud and HEPA vacuum attachment, and heat guns only below 1,100 degrees Fahrenheit.

  5. 5. Before a renovation in a 1965 house, the firm must give the owner the EPA lead hazard pamphlet. Under the federal rule, how early may the pamphlet be given?

    Safety

    • A. No more than 7 days before the work begins
    • B. No more than 30 days before the work begins
    • C. No more than 60 days before the work begins
    • D. Any time, with no limit
    Show answer

    Correct answer: C

    • A. No more than 7 days before the work begins

      Wrong: not the limit in the rule.

    • B. No more than 30 days before the work begins

      Wrong: not the limit in the rule.

    • C. No more than 60 days before the work begins

      Correct answer

      Correct: no more than 60 days before (40 CFR 745.84).

    • D. Any time, with no limit

      Wrong: the rule sets a 60-day window.

    Explanation

    40 CFR 745.84 requires the firm, no more than 60 days before beginning renovation in a dwelling unit of target housing, to give the owner the EPA lead hazard pamphlet (and, if the owner does not live in the unit, an adult occupant as well).

  6. 6. A certified renovator wants to use a heat gun to strip paint in a pre-1978 house. Under the federal lead renovation rule, the heat gun may be operated only at temperatures below:

    Safety

    • A. 500 degrees Fahrenheit
    • B. 750 degrees Fahrenheit
    • C. 1,000 degrees Fahrenheit
    • D. 1,100 degrees Fahrenheit
    Show answer

    Correct answer: D

    • A. 500 degrees Fahrenheit

      Wrong: 500 degrees is not the limit in the rule.

    • B. 750 degrees Fahrenheit

      Wrong: 750 degrees is not the limit in the rule.

    • C. 1,000 degrees Fahrenheit

      Wrong: 1,000 degrees is not the limit in the rule.

    • D. 1,100 degrees Fahrenheit

      Correct answer

      Correct: below 1,100 degrees Fahrenheit (40 CFR 745.85(a)(3)(iii)).

    Explanation

    40 CFR 745.85(a)(3)(iii) permits operating a heat gun on painted surfaces only at temperatures below 1,100 degrees Fahrenheit. Open-flame burning or torching is prohibited outright.

    Source

  7. 7. A crew will remove old painted trim in a remodel. The work is not abrasive blasting. Under Cal/OSHA, what is the permissible exposure limit for airborne lead, as an 8-hour time-weighted average?

    Safety

    • A. 2 micrograms per cubic meter
    • B. 10 micrograms per cubic meter
    • C. 30 micrograms per cubic meter
    • D. 50 micrograms per cubic meter
    Show answer

    Correct answer: B

    • A. 2 micrograms per cubic meter

      Wrong: 2 is the action level, not the exposure limit.

    • B. 10 micrograms per cubic meter

      Correct answer

      Correct: 10 micrograms per cubic meter (section 1532.1).

    • C. 30 micrograms per cubic meter

      Wrong: 30 micrograms per cubic meter was the action level before the 2025 amendment, not the exposure limit.

    • D. 50 micrograms per cubic meter

      Wrong: an outdated figure; the current limit is 10.

    Explanation

    Title 8 section 1532.1 (amended effective January 1, 2025) sets the permissible exposure limit for lead in construction at 10 micrograms per cubic meter of air as an 8-hour time-weighted average. The action level is 2 micrograms per cubic meter.

  8. 8. Next week a contractor will remove lead-containing paint from 300 square feet of walls by manual scraping, one of the lead standard's trigger tasks. The paint is well above 0.5 percent lead. Under Cal/OSHA, when must the nearest district office receive the notice?

    Safety

    • A. At least 24 hours before the work starts
    • B. At least 48 hours before the work starts
    • C. At least 10 working days before the work starts
    • D. Within 24 hours after the work starts
    Show answer

    Correct answer: A

    • A. At least 24 hours before the work starts

      Correct answer

      Correct: received at least 24 hours before the work starts (section 1532.1).

    • B. At least 48 hours before the work starts

      Wrong: not the time in the rule.

    • C. At least 10 working days before the work starts

      Wrong: 10 working days is the federal asbestos demolition notice, not the lead notice.

    • D. Within 24 hours after the work starts

      Wrong: notice must be received before the work starts; even unforeseen urgent work needs telephone notice before it begins.

    Explanation

    Title 8 section 1532.1(p) requires the nearest Cal/OSHA district office to receive notice at least 24 hours before planned lead work that includes a trigger task starts. It may be sent by letter, fax or email, or given by telephone followed by written notice within 24 hours of the call. No notice is needed for less than 100 square or linear feet, or for material under 0.5 percent lead, neither of which applies here. Only unforeseen urgent work may start sooner, and even then telephone notice must come before the work begins.

Test yourself

Try 25 free General Building practice questions from all five sections. Each answer explains the rule and names the code section it comes from. No sign-up.

See what the General Building exam covers