Three sets of lead rules apply to California contractors. The EPA's Renovation, Repair and Painting (RRP) rule covers paid work that disturbs paint in housing built before 1978: the firm must be EPA-certified, and minor repair work that disturbs 6 square feet or less per room inside or 20 square feet or less outside is outside the rule (window replacement and demolition never count as minor) (40 CFR §745.82, 40 CFR §745.83). Cal/OSHA protects the workers: since January 1, 2025 the construction lead limit (PEL) is 10 micrograms per cubic meter and the action level 2 (8 CCR §1532.1). The California Department of Public Health (CDPH) certifies the people who do long-term lead abatement (17 CCR §36100).
This guide takes each rule in turn: who it covers, the numbers it uses and what it requires on the job. It ends with the traps that come from mixing them up. CSLB's B study guide puts lead under environmental safety, and the Cal/OSHA limits also show up in personnel safety questions.
The EPA renovation rule (RRP)
Who and what it covers
- Target housing. The rule covers renovations done for pay in housing built before 1978 and in child-occupied facilities built before 1978. Housing for the elderly or people with disabilities, and 0-bedroom units, are left out unless a child under 6 lives there or is expected to. (40 CFR §745.82, 40 CFR §745.103)
- Certified firm. A firm paid to do the work must be EPA-certified. The work is directed by a certified renovator and done by certified renovators or by workers trained by one. A "firm" includes a sole proprietor, so a one-person painting business needs certification too. (40 CFR §745.82, 40 CFR §745.83)
- When it does not apply. The rule does not apply where a certified inspector, risk assessor or certified renovator has properly found the affected parts free of lead-based paint. Lead-based paint means lead at or above 1.0 milligram per square centimeter or 0.5 percent by weight. (40 CFR §745.82)
- Homeowners. People working on their own home are generally not covered, unless they rent out any part of it, run a child care center in it, or buy, renovate and sell homes for profit. (40 CFR §745.82)
Minor repair and maintenance
Minor repair and maintenance is outside the rule. It is work that disturbs 6 square feet or less of painted surface per room inside, or 20 square feet or less outside, with no prohibited practices. It never includes window replacement or demolition of painted surfaces, however small. Jobs in the same room within 30 days count as one job. (40 CFR §745.83)
| Job | Paint disturbed | Covered by the rule? | Source |
|---|---|---|---|
| Patch and repaint a wall in one room | 5 square feet inside | No: 6 square feet or less | 40 CFR §745.83 |
| Scrape exterior trim | 15 square feet outside | No: 20 square feet or less | 40 CFR §745.83 |
| Scrape exterior trim | 30 square feet outside | Yes: over 20 square feet | 40 CFR §745.83 |
| Replace one window | 4 square feet | Yes: window replacement never counts as minor | 40 CFR §745.83 |
Before the work: the pamphlet
Give the owner the EPA lead hazard pamphlet no more than 60 days before the work starts in a dwelling unit. Get a written acknowledgment, or a certificate of mailing at least 7 days before the work. If the owner does not live there, give it to an adult occupant too. (40 CFR §745.84)
On the job: work practices
- Inside, cover the floor with taped-down plastic at least 6 feet beyond the surfaces being worked on. (40 CFR §745.85)
- Outside, cover the ground at least 10 feet beyond the work, and close doors and windows within 20 feet. Use larger distances where needed to contain the dust. (40 CFR §745.85)
- Prohibited: open-flame burning or torching of painted surfaces. (40 CFR §745.85)
- Restricted: power sanders, grinders and similar tools only with a shroud and HEPA vacuum attachment; a heat gun only below 1,100°F. (40 CFR §745.85)
After the work: records and certification
- Keep the records that show compliance for 3 years after the job is finished. Give the owner the compliance information when the final invoice is delivered or within 30 days of completion, whichever is earlier. (40 CFR §745.86)
- A firm's certification lasts up to 5 years; apply to re-certify at least 90 days before it runs out. (40 CFR §745.89)
- A renovator stays certified by taking a refresher within 5 years. A refresher with hands-on training certifies for 5 years; one without it, for 3 years. (40 CFR §745.90)
Cal/OSHA's lead standard for construction workers
Cal/OSHA's construction lead standard covers demolition, removal, renovation, repair and painting work wherever a worker may be exposed to lead. It was amended effective January 1, 2025, so older study material shows higher limits. (8 CCR §1532.1)
The limits
| Limit | Number | Source |
|---|---|---|
| Permissible exposure limit (PEL), 8-hour average | 10 micrograms per cubic meter of air | 8 CCR §1532.1 |
| Action level, 8-hour average | 2 micrograms per cubic meter of air | 8 CCR §1532.1 |
| Abrasive blasting, until January 1, 2030 | 25 micrograms per cubic meter of air | 8 CCR §1532.1 |
Exposure at or above the action level starts duties such as exposure monitoring and medical surveillance. The PEL is the most a worker may be exposed to as an 8-hour average. (8 CCR §1532.1)
Trigger tasks and interim protection
Some tasks are presumed to expose workers above the PEL until the employer measures the actual exposure. Where lead paint is present, the lowest level includes manual demolition (such as drywall), manual scraping and heat gun work. Higher levels include manual sanding, power tool sanding or grinding, abrasive blasting, welding, torch cutting and torch burning. (8 CCR §1532.1)
Until the exposure is measured, workers on trigger tasks get interim protection: respirators, protective clothing, change areas, eating areas, regulated work areas, blood lead testing and training. Workers on the highest-level tasks also get showers. (8 CCR §1532.1)
The 24-hour notice
Before lead work that includes a trigger task, the nearest Cal/OSHA district office must receive written notice at least 24 hours before the work starts. No notice is needed when: (8 CCR §1532.1)
- less than 100 square feet or 100 linear feet of lead-containing material will be disturbed;
- the only trigger task is torch cutting or welding for no more than 1 hour in a shift; or
- the material has less than 0.5 percent lead (5,000 parts per million, or 1.0 milligram per square centimeter).
For unforeseen urgent work starting within 24 hours, a phone call before work starts is allowed, followed by written notice within 24 hours. (8 CCR §1532.1)
Example: A crew will hand-scrape lead paint from 300 square feet of walls next week. Manual scraping is a trigger task and 300 square feet is over 100, so the district office must receive the notice at least 24 hours before work starts.
California's lead abatement rules (CDPH)
Abatement is work designed to reduce or eliminate lead hazards or lead-based paint in public and residential buildings. It is a different job from renovation that happens to disturb paint.
- Who may do it. Abatement designed to last 20 years or more is done only by a CDPH-certified lead supervisor or certified lead worker, and a certified supervisor is on site during work site preparation and cleanup. (17 CCR §36100)
- Notice. Before abatement, the person doing it fills out CDPH form 8551 (Abatement of Lead Hazards Notification), posts it at every entrance to the work area, and delivers it to CDPH at least 5 days before the work starts, except for abatement done in response to an identified case of lead poisoning. (17 CCR §36100)
- Certification. CDPH certifies lead supervisors, inspector/assessors, project monitors, workers and sampling technicians. Certified people take refresher training every 24 months.
Which rule is the question about?
| Question names | Rule | Key numbers | Source |
|---|---|---|---|
| Pre-1978 home, renovation, pamphlet, certified firm | EPA RRP | 1978; 6 and 20 square feet; 60 days; 6 and 10 feet of plastic | 40 CFR Part 745 |
| Worker exposure, PEL, district office notice | Cal/OSHA lead standard | 10 and 2 micrograms per cubic meter; 24 hours; 100 square feet | 8 CCR §1532.1 |
| Abatement, certified lead worker or supervisor | CDPH | Form 8551; 5 days | 17 CCR §36100 |
Traps to watch for
- Two different square-foot rules. EPA's minor repair limit is 6 square feet inside and 20 outside. Cal/OSHA's notice exception is 100 square feet or 100 linear feet. Read which rule the question names.
- Windows are never minor. Replacing one window is covered by the EPA rule even if it disturbs 4 square feet of paint.
- Old lead limits. Cal/OSHA's construction PEL of 10 and action level of 2 date from January 1, 2025. A book that shows other numbers is out of date.
- Received, not sent. Cal/OSHA's notice must reach the district office at least 24 hours ahead.
- Torching is prohibited; heat guns are restricted. Under the EPA rule, open-flame burning or torching of painted surfaces is prohibited; a heat gun is allowed only below 1,100°F.
- Sole proprietors count. A one-person business paid to disturb paint in a pre-1978 rental needs EPA firm certification.
How to use this guide
Learn the EPA numbers as a set (1978, 6 and 20 square feet, 60 days, 6 and 10 feet, 1,100°F, 3 and 5 years), then the two Cal/OSHA limits and the notice rule. Then answer the practice questions below this guide. Stormwater, construction waste and asbestos, the rest of environmental safety, are in our B exam safety notes.